Przejdź do treści

Zero-Emission Waste Conversion Technology – MHP System (Germany)

INVESTMENT OPPORTUNITY

Zero-Emission Waste Conversion Technology – MHP System (Germany)


An innovative, patented waste treatment technology is seeking capital to initiate its first commercial deployment. Developed by a team of professors and engineers in Germany, the MHP System converts unsorted municipal and industrial waste into a durable construction material — without incineration, emissions, or environmental damage.

Technology Summary – MHP System


A light-based, zero-emission process that mineralizes and petrifies waste to produce OecoStone® — a certified, inert, and structurally stable construction material. Process: Light irradiation → Mineral fluid infusion → Petrification Input: Mixed biodegradable and synthetic wasteOutput: Frost-resistant, low-flammable, non-toxic composite System Type: Modular, turnkey, built entirely in Germany Certifications: ISO 9001 and ISO 14001Delivery: Global

Strategic Implementation Options

Poland – Pilot Launch All land, technical documentation, and local partners are secured. EUR 4,000,000 needed to launch a pilot-scale systemIdeal for EU market entry, licensing, and showcasing operational viability Qatar or Major Urban RolloutFull-scale deployment (up to 200,000 tons/year)Ideal for national sustainability agendas, waste transformation, and local building material supplyAligns with ESG goals and climate policy in high-growth markets

Product Applications (OecoStone®)

Road construction (subbase)Landfill sealing layersPaving blocks and slabsFlood barriers and erosion controlModular construction and acoustic wallsConcrete replacement in low-load structures

Technical & Financial Comparison

ParameterMHP SystemTraditional IncinerationCAPEX (200,000 t/year)~€56 million€200–250 millionOPEX per ton€30–45€150–300EmissionsNoneCO₂, NOx, flue gas, dioxinsOutputConstruction-grade materialAsh, toxic combustion residueEnergy UseLowHighRequired LandfillNoAsh often landfilledSetup Time~12 months24–48 monthsTechnology StatusPatented, ready to launchEstablishedRisk ProfileInnovation stage (pilot needed)Mature, regulatory risk (EU bans)

Project Delivery Scope

Included: Engineering, fabrication, delivery, installation, on-site training, warrantyExecution: Built in Germany, delivered worldwideScalability: From demonstration to national systemsSupport: Technical and operational support provided

Next Steps

Immediate readiness for launch in Poland with minimal fundingFull plans and specifications available upon requestFlexible investment model: from low-entry pilot (EUR ~1M) to full-scale (EUR ~56M)Strategic partnership, licensing, and co-development models availableThe MHP System represents a transformative opportunity in circular waste management and green construction. With financing, the first operational plant can launch within months — starting in Poland or at scale in markets such as Qatar.